Adjustable Truck Topper Design
Client New Wave Management Faculty Advisor
Prof. Richard Burton
  • By
  • Adnan Malik
  • Arian Andkhoie
  • Kevin Cheung

2
Overview of Presentation
  • Problem Description (Adnan)
  • Constraints Criteria (Kevin)
  • What have we done so far? (Arian)
  • Project Schedule (Arian)

3
Objective To design a convertible truck box
cover.
Problem Definition
Truck topper
Truck tonneau
CONVERSION
4
Constraints Criteria
  • Must topper-tonneau conversion (and vice versa)
    should take 20-60 sec.
  • Assembly must be mountable by a maximum of 2
    people.
  • While the assembly is operating in cannot take
    any room in the truck box.
  • Must be able to withstand a Canadian Winter
  • Must keep weight as light as possible

5
Constraints Criteria (contd)
  • Cost lt approx. 1500.00 (CAD)/UNIT
  • Manual conversion process from topper-to-tonneau
    and vice versa
  • Cannot obstruct rear-view mirror
  • Must fit contours of various trucks (i.e.
    different trucks will have different sizes but
    for this design we will be designing for a Toyota
    Tacoma 2006 XRunner Edition).

6
What have we done so far?
  • Problem Formulation
  • Developed a detailed schedule
  • Comprehensive Literature Review
  • Material Selection
  • Analysis Scope Defined (Kinematics/Materials)
  • Conceptual Design Defined.
  • Challenge Found a patent on design idea!

7
Project Schedule
  • Milestone 1 October 31, 2008
  • Define a preliminary design solution
  • Start Analysis
  • Milestone 2 November 31, 2008
  • Complete analysis
  • Milestone 3 January 15, 2009
  • Initial Draft of Final Report Complete

8
THANK YOU