Title: Department of Defence Newbridge
1Department of DefenceNewbridge
- Experience of Designing a Building Using
Simulation Tools - A Case Study
- Department of Defence Decentralised Offices
- 28th Nov 2008
- Jay Stuart
- DW EcoCo
- Integrated Sustainable Design Consultants
2Department of DefenceNewbridge site
- The final design now under construction
3Department of DefenceNewbridge site
- IES for dynamic thermal simulation of whole
building - Ecotect for solar shading analysis
- Therm for thermal bridging analysis
Shading Analysis
Simulations for Value Engineering
3D thermal bridging simulations
Shading with trees
Thermal simulation
CFD simulation
Simulation work
Drawings from architects
Simple advice on shading Ventilation strategy
Timeline
4Department of DefenceNewbridge site
- Natural Ventilation Required by OPW
5Department of DefenceNewbridge site
- Competition stage simulation work
- (no shading, no atrium in the design)
6Department of DefenceNewbridge site
- Competition stage (no shading, no atrium)
7Department of DefenceNewbridge site
- Simple preliminary advice on shading options to
the architects
8Department of DefenceNewbridge site
- Ventilation for simulation
- Design guidelines provided to the architect for
- Natural Ventilation strategy
- Plan depth
- Atrium design
- Window design
- Solar shading
- U-values
9Department of DefenceNewbridge site
Energy Use Summary 138 kWh/m2/yr
10Department of DefenceNewbridge site
- CFD Simulation to SW corner office
11Department of DefenceNewbridge site
12Department of DefenceNewbridge site
13Department of DefenceNewbridge site
- Simulation work detail design simulation model
- Changed layout
- Solar shading
- Atrium considered for natural ventilation
14Department of DefenceNewbridge site
15Department of DefenceNewbridge site
- Solar shading with trees TRANSFORMATION of an
idea (considering information available and
software capabilities)
16Department of DefenceNewbridge site
- Simulation work detail design simulation model
17Department of DefenceNewbridge site
- Simulation work detail design simulation model
18Department of DefenceNewbridge site
- Results
- (after several iterations and discussions with
services engineers)
19Department of DefenceNewbridge site
- Results
- the energy breakdown
20Department of DefenceNewbridge site
- OPW Brief Internal temperatures are not to
exceed 26C for more than 5 of the occupied
hours and are not to exceed 27C at any time
during the year. - Measures
- Natural ventilation system
- An atrium to remove heat from the building and
reduce temperatures in areas on the ground floor - Solar control glazing to minimise solar gains
- Solar shading through brise soleil, overhangs,
recessed fenestration and foliage
21Department of DefenceNewbridge site
Mean Radiant Temperature for the office of the
Minister of Defence
( local cooling required )
22Department of DefenceNewbridge site
- Solar shading detail design
23Department of DefenceNewbridge site
- Solar shading detail design
- Refining the design with Ecotect
24Department of DefenceNewbridge site
- 3D Thermal Bridging Calculation
25Department of DefenceNewbridge site
- 3D Thermal Bridging Calculation
- Isotherms in external wall, caused by steel
fixings - Cold bridging is often not considered in U-value
calculations - Therm software
26Department of DefenceNewbridge site
- 3D Thermal Bridging Calculation
- U-value vs. insulation thickness
27Department of DefenceNewbridge site
- 3D Thermal Bridging Calculation
- U-value vs.
- density of cladding fixings
28Department of DefenceNewbridge site
- Simulation for Value Engineering
-
- Client requested following changes for value
engineering - Change U-value from 0.2 to 0.27 W/m2K
- Reduce lighting controls to a basic specification
29Department of DefenceNewbridge site
- Simulation for Value Engineering
- Previous model used variables changed one at a
time
30Department of DefenceNewbridge site
- Simulation for Value Engineering
31Department of DefenceNewbridge site
- P.Elliott and Co. Ltd.
- MOLA Architects
- WYG Engineers
- . 28th November 2008 . work continues.
32Department of DefenceNewbridge site
Thank You
- DW EcoCo Ltd.
- Integrated Sustainable Design Consultants