Standard Specifications Book of Specifications approved for general ... Transportation Commission and all supplements thereto in conflict therewith. ... – PowerPoint PPT presentation

Number of Views:1982
Avg rating:3.0/5.0
Slides: 26
Provided by: U554
Category:

less

Transcript and Presenter's Notes

Title: Standard Specifications For Road and Bridge Construction


1
Standard SpecificationsForRoad and Bridge
Construction
  • 2006 Edition

2
SPECIFICATION SECTION
  • Construction Engineer
  • Mark Wissinger
  • Const. Admin. Services Engineer
  • Lisa Durbin
  • Specification Section
  • Dan Smith, P.E. - Specification Engineer
  • Ryan Antonovich - Specification Specialist

3
SPECIFICATIONS
  • Specifications
  • The compilation of provisions in this book, the
    Supplemental Specifications, and Special
    Provisions for the performance of the project

4
SPECIFICATIONS
  • Standard Specifications Book of Specifications
    approved for general application and repetitive
    use
  • Supplemental Specifications Approved additions
    and revisions to the Standard Specifications
  • Special Provisions Revisions to the Standard
    and Supplemental Specifications applicable to an
    individual project

5
  • US
  • Standard
  • Railroad
  • Gauge
  • 4 ft 8-1/2 in

6
105.04 Coordination of Contract Provisions
  • 1. Question and Answer Forum Information
  • 2. Special Provisions
  • 3. Table of Contractor Submittals
  • 4. Plans
  • 5. Supplemental Specifications
  • 6. Standard Specifications
  • 7. Supplemental Detailed Drawings
  • 8. Detailed Drawings

7
SPECIFICATIONS
  • 2006
  • Spec Book
  • Effective with the
  • April Letting

8
SPECIFICATIONS
  • 2006 Edition
  • 1995 Edition
  • 270 Supplementals
  • 32 Standard Specials
  • Errata, Grammar and
  • Contractor Submittals

9
MAJOR REVISIONS
  • 30 Standard Special Provisions
  • 2 New Sections
  • Geotextiles 622 716
  • Contractor Submittals

10
STANDARD SPECIAL PROVISIONS
  • 103-1 Contract Time (Revised 12-15-05)
  • 1.      CONTRACT TIME 103 (Revised 12-15-05)
  • The work begins on the effective date stated in
    the "Notice to Proceed" and is to be completed in
          Working Days.
  • Perform no work during MDTs Construction
    Conference, February 6th through 8th, 2007.

11
(No Transcript)
12
(No Transcript)
13
1995 vs 2006 Edition
  • 102.02 CONTENTS OF BID PACKAGE
  • The bid package ordinarily includes the
    following
  • A. Proposal
  • B. Disadvantaged Business Enterprise (DBE)
    Requirements
  • C. Schedule of Items
  • D. Special Provisions
  • E. Current Supplemental Provisions
  • F. Wage Rate Schedules
  • G. Other documents included by reference but
    not attached
  • H. FHWA Form 1273 (Required Contract
    Provisions for Federal-aid Construction
    Contracts), when applicable
  • I. EEO Affirmative Action Requirements on
    Federal and Federal-aid Construction Contracts
    and
  • J. Contract Plans.

14
CONTRACT
  • SPECIAL PROVISIONS
  • AID/STATE PROJECT NO. XXXXXXXXXX
  • (Revised 1-31-06)
  • The following special provisions are hereby made
    a part of this contract and supplement and/or
    supersede any sections of the Standard
    Specifications for Road and Bridge Construction,
    1995 Edition adopted by the Montana Department of
    Transportation and the Montana Transportation
    Commission and all supplements thereto in
    conflict therewith.
  • The following books are also hereby made a part
    of this contract and are available upon request
    to the CONTRACT PLANS BUREAU, MONTANA DEPARTMENT
    OF TRANSPORTATION, 2701 PROSPECT AVENUE, PO BOX
    201001, HELENA MT 59620-1001.
  • (1) Book entitled "Standard Specifications for
    Road and Bridge Construction 1995 Edition."
  • (2) Most recent version of "Detailed Drawings.
  • The U.S. Department of Transportation (DOT)
    operates a toll free number at 1-800-424-9071
    Monday through Friday, 800 a.m. to 500 p.m.
    eastern time. Anyone with knowledge of possible
    bid rigging, bidder collusion, or other
    fraudulent activities should use this number to
    report such activities. All information will be
    treated confidentially and callers may remain
    anonymous.
  • (3) Questions raised by potential bidders on this
    project, and the answers and other information
    posted by the Department on MDTs Question and
    Answer Forum found at the website
    http//www.mdt.mt.gov/business/contracting.shtml
    as of 500 p.m. on the day before the bid
    letting.
  • MDT attempts to provide reasonable accommodations
    for any known disability that may interfere with
    a person participating in any service, program or
    activity of the department. Alternate accessible
    formats of this document will be provided upon
    request. If reasonable accommodation is needed
    to participate in MDT bid lettings, call the
    Civil Rights Bureau at 444-6331 or TTY
    406-444-7696 TTY 1-800-335-7592 (toll free).

15
(No Transcript)
16
Supplemental Specification Change Process
17
Spec Change Process
  • Jan 2002 Construction Memo
  • Spec to be Revised
  • Section or Subsection
  • Proposed Language
  • Very general
  • Reason for the Change
  • A List of who will be Impacted
  • A Summary of those consulted and involved in the
    revision

18
Who can propose a spec change?
  • MDT Construction
  • EPMs
  • Reviewers
  • DCEs
  • MDT Design
  • MDT Legal
  • Contractors
  • FHWA

19
Types of Changes
  • Major Spec Change
  • Minor Spec Change
  • Errata

20
Major Spec Change
  • Example
  • 101.40 Major Item
  • 104.02.3 Significant Changes in the Character of
    Work
  • 1 Month Comment Period
  • Distributed to
  • District Administrators
  • Department Bureau Chiefs
  • District Construction Engineers
  • Lab Supervisors
  • Engineering Project Managers
  • FHWA
  • Montana Contractors Association

21
Timeline of a Major Specification Change
  • 1 Month Comment Period
  • 1-2 Weeks for Spec Section to finalize revision
    and forward to Const. Engineer
  • 1-2 Weeks for FHWAs final review and approval
  • Final version will be sent to Contract Plans on
    the Advertising Date (6 weeks prior to Bid
    Letting)
  • 3 MONTHS

22
Minor Specification Change
  • 1-2 Week Comment Period
  • Distribution
  • Same as Major Spec Change
  • Example
  • 101.82.2 Business Hours

23
Errata
  • No Comment Period Required
  • Notification to FHWA
  • Example
  • Misspelled words within existing specs
  • Changes to Testing Procedures
  • MT-505 rescinded

24
105.04 Coordination of Contract Provisions
  • 1. Question and Answer Forum Information
  • 2. Special Provisions
  • 3. Table of Contractor Submittals
  • 4. Plans
  • 5. Supplemental Specifications
  • 6. Standard Specifications
  • 7. Supplemental Detailed Drawings
  • 8. Detailed Drawings