VMF Issues for ACCB 052 - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

VMF Issues for ACCB 052

Description:

Overlay Message and Symbology. Overlay Message Re-design ... Symbology - Discussion. Army CCB role in coordinating SSMC change proposals. ... – PowerPoint PPT presentation

Number of Views:100
Avg rating:3.0/5.0
Slides: 7
Provided by: chestere7
Category:
Tags: accb | vmf | issues | symbology

less

Transcript and Presenter's Notes

Title: VMF Issues for ACCB 052


1
VMF Issues for ACCB 05-2
2
Topics
  • Category Markings on VMF Message Description
    Pages
  • Restructure of URN Number for Rev B
  • Overlay Message and Symbology

3
Category Markings on VMF Message Description Pages
  • VMFSG Reacting to comments that the category
    markings were inconsistent and causing confusion
    to implementers
  • Army assigned an Action Item to propose a
    solution. Army solution is documented in ICP
    AV05-059.
  • Removes the M category from the standard
  • Removes all syntax marking
  • Redefines what X means

4
Restructure of Unit Reference Number
  • Concern is that the current URN field will
    require modification to meet coalition needs
  • Goal is to restructure the URN field to meet all
    future needs and simply the URN management
    process
  • Two proposals are under study
  • Insert a Nationality field and tie it to the
    current 24 bit number.
  • Alternate solution is to define a REGEX
    expression that would be a composite field such
    as Target Number is to denote Nationality and
    number.

5
Overlay Message and Symbology
  • Overlay Message Re-design
  • The re-design is an attempt to tighten the
    mapping between the fields in the VMF message and
    the requirements of MIL-STD-2525.
  • Lays out the symbols by category (Units,
    equipment, etc.).
  • Symbology - Discussion
  • Army CCB role in coordinating SSMC change
    proposals.

6
VMF ICP Processing Status
SEP OCT NOV
DEC JAN FEB
MAR APR
VMF Subgroup 05-3 Draft ICPs ( 24 )
ROAD TO MIL-STD-6017A 53 ICPs Approved as of
JCCB 05-2 24 ICPs Forwarded from VMFSG
05-3 13 New Army ICPs from ACCB 05-2 About
80 VMF ICPs will be incorporated into
MIL-STD-6017A anticipated for release 1 April
2006.

( 14 )
( 10 )
VMF SG 05-3
VMF SG 05-4
JMCCB 05-3
ARMY CCB 05-2
( 13 )
MIL-STD-6017 Comment Resolution Meeting
MIL-STD-6017A Release
New Army ICPs
VID (SWB-3)
( 36 )
VMF ICPs Approved as of JCCB 05-2 ( 53 )
( 75 - 85 Approved VMF ICPs )
MIL-STD-6017 Preparation
Write a Comment
User Comments (0)
About PowerShow.com