Title: VMF Issues for ACCB 052
1VMF Issues for ACCB 05-2
2Topics
- Category Markings on VMF Message Description
Pages - Restructure of URN Number for Rev B
- Overlay Message and Symbology
3Category Markings on VMF Message Description Pages
- VMFSG Reacting to comments that the category
markings were inconsistent and causing confusion
to implementers - Army assigned an Action Item to propose a
solution. Army solution is documented in ICP
AV05-059. - Removes the M category from the standard
- Removes all syntax marking
- Redefines what X means
4Restructure of Unit Reference Number
- Concern is that the current URN field will
require modification to meet coalition needs - Goal is to restructure the URN field to meet all
future needs and simply the URN management
process - Two proposals are under study
- Insert a Nationality field and tie it to the
current 24 bit number. - Alternate solution is to define a REGEX
expression that would be a composite field such
as Target Number is to denote Nationality and
number.
5Overlay Message and Symbology
- Overlay Message Re-design
- The re-design is an attempt to tighten the
mapping between the fields in the VMF message and
the requirements of MIL-STD-2525. - Lays out the symbols by category (Units,
equipment, etc.). - Symbology - Discussion
- Army CCB role in coordinating SSMC change
proposals.
6VMF ICP Processing Status
SEP OCT NOV
DEC JAN FEB
MAR APR
VMF Subgroup 05-3 Draft ICPs ( 24 )
ROAD TO MIL-STD-6017A 53 ICPs Approved as of
JCCB 05-2 24 ICPs Forwarded from VMFSG
05-3 13 New Army ICPs from ACCB 05-2 About
80 VMF ICPs will be incorporated into
MIL-STD-6017A anticipated for release 1 April
2006.
( 14 )
( 10 )
VMF SG 05-3
VMF SG 05-4
JMCCB 05-3
ARMY CCB 05-2
( 13 )
MIL-STD-6017 Comment Resolution Meeting
MIL-STD-6017A Release
New Army ICPs
VID (SWB-3)
( 36 )
VMF ICPs Approved as of JCCB 05-2 ( 53 )
( 75 - 85 Approved VMF ICPs )
MIL-STD-6017 Preparation