Title: Iowa Falls Steel Arch


1
Iowa Falls Steel Arch
Project Overview
  • Hussein Khalil, P.E.

Iowa ABC Workshop, August 11-12, 2008 Des
Moines, Iowa
2
Iowa Falls Steel ArchProject Location
3
Iowa Falls Steel Arch
Project Description
  • Replace a 255 x 24 Open Spandrel Concrete Arch
    with a 230 x 64 Partial Thru Steel Arch
  • Existing bridge and a nearby church are on the
    National Register of Historic Places
  • Difficult site conditions (vertical limestone
    banks)
  • Environmentally sensitive area
  • Existing sewer lines directly below the structure

4
Existing
Proposed
5
Iowa Falls Steel Arch
  • Limits of Construction

6
Iowa Falls Bridge
  • Typical Cross Section

12
7
Iowa Falls Steel Arch
Project Background
  • Need for Project
  • Existing Bridge is Structurally Deficient
  • No Practical Long Term Rehabilitation Options
  • Traffic Estimates
  • Year 2011 11,000 ADT with 8 Trucks
  • Year 2031 15,400 ADT with 8 Trucks

8
Iowa Falls Steel Arch
Project Background
  • Feasibility study alternatives considered
  • Single Span Steel Arch
  • Single Span concrete Deck Arch
  • Two Span Prestressed Girder Bridge
  • City of Iowa Falls and Historical Commission
    Requested the Bridge Be Replaced with an Open
    Spandrel Bridge with Decorative Railings,
    Walkways, and Lighting

9
Iowa Falls Steel Arch
Project Background
  • Special Considerations
  • St. Matthews by the Bridge Episcopal Church
    Listed in the National Register of Historic
    Places and Located about 20 West of the North
    End of the Bridge.
  • Construction Vibration Concerns.
  • Two Sanitary Sewer Lines
  • Recommended that These be Replaced and Relocated
    Prior to Bridge Construction
  • Dam Located Downstream of Bridge
  • May Allow Lowering Water Level to Facilitate Some
    Construction Activities with Approval from DNR

10
Iowa Falls Steel Arch
Session Objectives
  • Identify accelerated construction methods to
    complete removal and replacement in one
    construction season
  • Avoid demolition/construction related vibration
  • Protect existing sewer lines (debris not allowed
    to fall into the river)
  • Evaluate the use of temporary falsework or/and
    barges