Title: FLOW THROUGH WATER TREATMENT SYSTEM USING ALUM
1FLOW THROUGH WATER TREATMENT SYSTEM USING ALUM
PAM
REEDY CREEK IMPROVEMENT DISTRICT
2BRIDGE DEMOLITION PROJECT _at_ EPCOT WINTER 2000
3High Pressure Water Blasting To Remove Concrete
Down To Rebar
4After Blasting With 15,000 psi Water Jet
5Runoff Turbidity Greater Than 300 NTUs
6Runoff Diverted Into Bridge Stormwater System
7Aluminum Sulfate Added Via Gravity Feed From
Trailer Rig
8Wood Baffle Boards Skim Large Concrete Debris
Provide Alum Mixing
9Runoff Flows Into 1st Cell Of Three Stage
Treatment System (Inflow gt300 NTU)
101st Stage Treatment Inflow gt300 NTU Outflow
30 NTU
112nd Stage Treatment Inflow 30 NTU Outflow 17
NTU
12Polyacrylamide (PAM) Floc Log Used For Final
Polishing (40-50 Turbidity Reduction) Free
Aluminum Binding
13Final Discharge Water Sheet Flows Over Grass Berm
(Trapping Sediment)Then Into Canal Behind
Floating Turbidity Boom
14Canal Receiving Water 15 NTU Final Discharge
Water 10-12 NTU
15Self Contained Water Treatment System
16Treatment System Performance System Usage 15
Days Daily Volume 80,000 Gallons Total Pumping
Volume 96 Million Gallons Alum Usage 40 Gal
/ Day (600 Gal Total) Treatment System Size 50
x 15 Ft. Turbidity Reduction (NTU) gt300 (Inflow)
15 (Outflow) Turbidity Reduction 95
Contractors System Cost lt 1,000 Time Lost
Due To Non-Compliance NONE!
17Contractor Hubbard Construction Contact Jeff
Forsythe (407)560-0442