Title: FEE Card Mounting Strategy and Problems


1
FEE Card Mounting - Strategy and Problems
2
IROC border problems
A
3
service support
cut A
LV, cooling
sealing bar
Al-body
HV-Box
end-plate
4
IROC border problems
B
5
?
cut B
38 mm
40 mm
FEE mounting bar
6
problem/to do list
  • check/optimize space constraints SSW ? FFE
  • test of connections under sheer forces (how much
    moves SSW relative to endplate under load?)
  • FEE mounting bars fixation, should be adjustable
    to compensate for SSW movement
  • convenient tools for closing/opening of HARWIN
    connectors
  • copper cooling plates should not cover connectors
  • ...

7
2-sector model
  • setting up 2-sectors (endplate, SSW)
  • one SSW fully equipped (cooling, LV, ...)
  • 2 endplate sectors fully equipped with ROCs
  • test/develop FEE fixation
  • develop mounting strategy tools
  • status
  • one endplate sector available, one endplate
    sector in production,
  • fully equipped SSW sector available (Rainer)

8
time estimate
  • mounting cards (experience from ROC tests at
    GSI)
  • 1 hrs to close all connectors (IROC, optimal
    conditions)
  • 2-3 hrs for non-optimal conditions
  • insertion of FEE
  • insertion of flex cables
  • border FEE difficult
  • testing of connectivity after insertion
  • connect RCU, cooling (card-wise or row-wise ?)
  • 5 min/card (?) ? 3-4 hrs
  • total 1 chamber/day/team (IROC, OROC ?)