Title: Grupo Beraza Hermanos and Affiliated Companies


1
Grupo Beraza Hermanosand Affiliated Companies

G B H
Company Overview
2
Grupo Beraza Hermanos Inc.
G B H
  • GBH Board of Directors
  • President
  • Jose Maria Beraza
  • CEO
  • Pablo Antoniazzi

3
G B H
  • Past Activities
  • Banking
  • Construction
  • Aircraft Manufacturing
  • Communications
  • Printing
  • Packing Plants
  • Retailing

4
G B H
  • Current Activities
  • Farming
  • Agriculture Companies with a Net worth of
    166,825,112 million dollars.
  • Services
  • Aeronautic Maintenance.
  • Distribution
  • Distribution, Maintenance and overhaul of
    Turbines and Helicopters.
  • Manufacturing
  • Aeronautic Companies with a Net worth of
    43,109,590 million dollars.

5
G B H
  • Chemical
  • GBH is on the implementation stage of an
    Ammonia Urea Fertilizer Plant, located on the
    Federative Republic of Brazil.
  • Security
  • Brijot Imaging Systems Inc.
  • www.Brijot.com

6
G B H
  • Communications
  • One Planet Communications Inc. Long Distance in
    Argentina an is on the stage of getting licenses
    to operate.
  • GSR Inc. making research of satellite networks.
  • USA Long Distance carrier in negotiations at this
    stage.
  • GNT MOBILE an associated European company now
    implementing projects in Africa.

7
G B H
  • Construction
  • As a result of the previous developments
    associations with different constructions
    companies.
  • Energy
  • Association with Atlantic Pacific Energy Ltd. To
    develop a 2000 MW Electric Power Plant in Turkey.
  • Waste to Energy Plants in association with
    SEFICO www.sefico.com

8
G B H
Consortium formed by these two companies
9
  • Improved Thermal Conversion plants
  • One Million Tons of Waste
  • Produces the same electricity as 1 ½ Million
    Barrels of Oil would.

www.sefico.com
Experience in the Municipal Field since 1961
10
  • Every Ton of Waste used to generate power, saves
    1.5 barrels of Oil.
  • Latin America alone generates 500,000 tons of
    waste per day.
  • Equivalent to the use of 750,000 barrels of Oil
    per day just to generate power.

11
Applied and proven technology
12
  • Conceptual rendering of a plant
  • There are no high smoke stacks, no air
    pollutants, only water vapor is released

13
  • Efficient elimination of solid wastes via
    gasification without creating any odors
  • Do not produce any contamination
  • Power generation using solid wastes as fuel,
    without massive utilization of fossil fuels
  • Use of inert residues for improvement of road
    bases and as concrete additives
  • Recycling during the process, not before

14
TYPES OF WASTES THAT WE CAN PROCESS
  • Municipal
  • Industrial
  • Toxic
  • Medical
  • Pathological
  • Tires
  • Plastics
  • Hydrocarbons
  • Liquids and Solids

15
Current Projects of W 2 E
  • Brazil
  • Spain
  • Venezuela
  • Dominican Republic
  • Peru
  • Ecuador

16
Other Projects in development by
17
Airport Albacete-La Roda Spain
  • World Wide, air transport keeps growing.
  • This airport, located less than 150 Km. S E from
    Madrid, near Valencia, will be a Cargo Hub in
    Spain with daily shipments to America, Europe,
    Africa Asia.
  • Cargo will be its main objective, it will not be
    a byproduct of commercial air traffic.
  • Open 365 days a year.

18
Phase I
  • 12 operations at peak time
  • 14 Parking positions
  • 36,000 sq. Meters of cargo area
  • 350,000 sq. Meters of Land Development

19
Phase II
  • 25 operations at peak time
  • 34 Parking positions
  • 84,000 sq. Meters of cargo area
  • 700,000 sq. Meters of Land Development

Phase II
20
Phase III
  • 12 operations at peak time
  • 77 Parking positions
  • 200,000 sq. Meters of cargo area
  • 1,800,000 sq. Meters of Land Development

Phase III
21
LOCATION
22
  • Estimated Project Cost 400 Million.
  • Airport type 4F.
  • Landing strip 4,500 meters.
  • Will handle airplanes F type.
  • Loading Platform of 13 Million square meters, the
    largest in Europe.

23
AIR CARGO
Operating profit 30 More than passenger
Growth of 6.5/yr
Period between 2002 2010
Operating cost 50 Less than passenger
24
Health related Projects
DRÄGER SIEMENS World Wide Hospital Financing
GISSA Proximity Family Retirement Houses
25
Housing in association with Quinton Finance
DAKAR GATE, SENEGAL MINISTRY OF HOUSING,
VENEZUELA HOSPITAL, CHINA HOG ISLAND RESORT,
GRENADA W.I.
26
Trading / Shipping in Bulk
SCRAP METAL IRON ORE COAL OIL PRODUCTS PETROTANK
27
General Construction Projects
BUS TERMINAL, LIMA PERU PINNACLE INDUSTRIAL
HOLDING, PERU
28
CONTACTS
4135 Laguna Street, Suite D Coral Gables, Fl
33146 Phone 305 443 9552 Fax 305 443
9435 Pablo Antoniazzi pantoniazzi_at_aol.com
Emilio Zabaleta sefico1_at_aol.com