Primrose Hill, Huddersfield Yorkshire Housing - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Primrose Hill, Huddersfield Yorkshire Housing

Description:

Primrose Hill, Huddersfield. Yorkshire Housing. Jimm Reed. Senior ... Primrose Hill- Newbuild. Ecohomes 'Excellent' scheme. Solar PV & Solar Thermal Panels ... – PowerPoint PPT presentation

Number of Views:100
Avg rating:3.0/5.0
Slides: 22
Provided by: jimm86
Category:

less

Transcript and Presenter's Notes

Title: Primrose Hill, Huddersfield Yorkshire Housing


1
Primrose Hill, HuddersfieldYorkshire Housing
  • Jimm Reed
  • Senior Development
  • Project Manager

2
Primrose Hill- Newbuild
  • Ecohomes Excellent scheme
  • Solar PV Solar Thermal Panels
  • Energy Efficiency
  • Renewable Materials
  • Off Site Manufacture
  • Regen scheme

3
Scheme Background
  • Highly Deprived Area
  • Local Authority Estate
  • Rotten Core- Death Row
  • Reputation and Cycle of decline
  • Unsustainable housing

4
Community Involvement
5
(No Transcript)
6
An Approach to Sustainability
  • Scheme Attributes
  • Site assessment - natural history, drainage,
    transport links, solar aspect etc
  • How can design help the scheme?
  • Natural Features topography, flora, fauna
  • Contactor and Materials Local low transport
    carbon emissions
  • Services and facilities

7
Aspirations Objectives
  • Sustainability- Exemplar schemes- but not just a
    Demonstration projects
  • Positive impact on local environment
  • Ecohomes Excellent incorporating Energy
    Efficient Homes and Renewable Energy
  • Moving towards Code for Sustainable Home level 3
    and better.
  • Aspiring to Carbon Neutrality

8
Renewables Options
  • Biomass
  • CHP
  • Ground Source Heat Pump
  • Micro Wind- Domestic and Communal

9
Renewables- pros cons
10
The Lowdown
  • Energy Efficiency via Design Materials
  • Minimal impact from Materials Methods
  • Passive benefits- aspect and Solar Gain
  • Water Conservation/ drainage strategy


11
Renewables Options
  • PV
  • Solar Thermal Water Heating

12
  • Partnership with Kirklees Environment Unit
  • 113kW of Photovoltaic installations
  • 63 Solar Thermal Installations
  • The highest concentration of domestic solar
    technology anywhere in the UK.

13
(No Transcript)
14
(No Transcript)
15
Effect in Use
16
Ecohomes Elements
  • Ecohomes Rating Excellent- Key points
  • Energy CO2-lt 25kg/m2/yr
  • Fabric 27 improvement on Building Regs
  • Transport- Bus routes and Cycle storage
  • Pollution- non-polluting materials, Low NOx
    boilers, 50 reduction in Surface water run off,
    Solar Thermal heating
  • Materials- 100 FSC timber in building elements
    facing materials
  • Water Use- reduced to 44l per person per day
  • Ecological Enhancement- Ecological Assessment

17
Concrete- A Compromise
  • Structherm Fastbuild System
  • OSM
  • Local Manufacturer
  • Pulverised Fuel Ash
  • Thermal Mass
  • Recyclable
  • Sound insulation
  • High Energy to manufacture
  • Additional cost

18
Ecohomes- The Cost?
Ecohomes Rating Excellent- Key points Energy
Around 10 of basic building elements for Timber
frame/ Structherm 200,000 Fabric Around
10,000 for added insulation Transport- Cycle
storage- around 10,000 for increased external
storage Pollution- Low NOx boilers, around 100
per property for increased spec boilers. Around
200,000 for water attenuation scheme. 50
reduction in Surface water run off. Zero Carbon
Energy- Solar Thermal heating around 2,350 per
property. PV around 5,000 per kW Materials- No
extra cost Water Use- No extra cost Ecological
Enhancement- Ecological Assessment- around
1,500
19
Ecohomes The Cost?
  • Over 79 properties from Good to Very Good/
    Excellent
  • around 11,000 per property
  • Without PV- around 6,000 per property.

20
What Next?
  • Replacement for Ecohomes
  • Code 3 between Very Good/ Excellent
  • Mandatory requirements- CO2 and water saving
  • Cost? 5,000-15,000

21
Thank you!