WATERHM activities: CNES programmatic status - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

WATERHM activities: CNES programmatic status

Description:

Direction for Strategy and Programs - CNES. WATER-HM workshop, Paris, 01/02/08 ... 3MI (Multiviewing Multichannel Multipolarization Imager) (Polder F/O) ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 7
Provided by: CNES62
Category:

less

Transcript and Presenter's Notes

Title: WATERHM activities: CNES programmatic status


1
WATER-HM activitiesCNES programmatic status
  • Prepared by Eric Thouvenot Pascale
    Ultré-Guérard
  • Direction for Strategy and Programs - CNES

2
Earth observation programme (multilateral)
  • Phases C/D
  • Jason-2 (juin 2008)
  • Smos (nov 2008)
  • Megha-Tropiques (2009)
  • Pléiades (2009)
  • Vénms (2010) pb de filtres
  • SARAL/Altika (2009-2010)
  • Swarm (2010)
  • Phase A
  • SIFTI
  • SWIM/CFOSAT
  • Phase E
  • Déméter
  • Jason
  • SPOT, Végétation
  • Parasol,
  • Calipso
  • Iasi/Metop

3
Pre-Phase A 2007- 2008
  • MTG
  • Vegetation-Gap Filler with ESA/DTEC and Belgium
  • Water/SWOT (coop. NASA)
  • E-Corce (constellation of satellites HR)
  • Trade Off LEO-GEO for coastal regions and risk
    management (coop. JAXA)
  • Infra red sounder for post EPS (IASI F/O, coop.
    Eumetsat)
  • 3MI (Multiviewing Multichannel Multipolarization
    Imager) (Polder F/O)
  • TIR MISTIGRI (study of vegetation cycle high
    resolution and high revisit, coop. Spain)
  • Lidar for altimetry and bathymetry
  • Hyperspectral
  • Microméga (Grace F/O)
  • CO2 Minicarb
  • Pollution from geostationnary orbit

4
WATer Elevation Recovery Hydrosphere Mapper
  • Mission combining research needs associated to
    hydrology and oceanography mapping of water
    level for rivers, lakes, and oceans (including
    coasts)
  • Principle Wide-swath interferometric, Ka-band
    altimeter
  • Cooperation scheme TBD (NASA/CNES/NOAA/)
  • Status
  • Phase 0 underway
  • Phase A possible in mid-2008
  • Launch 2015

5
Phase 0 status
  • Exchange of letters between NASACNES
  • Agreement on conducting a cooperative preliminary
    study about WATER-HM
  • In the spirit and in the continuation of 20
    years of cooperation in space altimetry
  • Agreement to constitute a common Science Working
    Group
  • Points of Contact for Programmatics and Science
    designated
  • CNES phase 0 study in progress, fully funded
  • SWG created, Terms Of Reference agreed

6
Follow-on activities
  • CNES/NASA and CNES/NOAA meetings at
    CEO/Administrator levelgt WATER-HM is a high
    priority in France/US space cooperation
  • Formal review of proposals at CNES end of
    September, 2007gt WATER-HM ranked first for
    entering phase A in 2008gt CNES will be able to
    fund phase A in 2008/2009
  • dedicated project team
  • industrial science activities
  • Conditions/constraints to enter phase A in 2008
  • Phase 0 has to be ok
  • no showstopper
  • science goals requirements in agreement with
    phase 0 design(s)
  • Cooperation/coordination with NASA to be
    discussed
  • CNES does not intend to perform the whole set of
    phase A activities
  • Preliminary responsibility/task sharing to be
    discussed
Write a Comment
User Comments (0)
About PowerShow.com