Title: Project Zeus
1Project Zeus
2The History
- Accenture 2003
- Project Challenge
- A TUI Group initiated review of group airlines
maintenance organisations - Objective To identify opportunities with cost
savings potential - Findings 4 options to pursue
- Outsource all E M group requirements to a
strategic partner - Local re-engineering and the implementation of a
single Engineering IT system - (GEMS group engineering maintenance system)
- Single MRO
- Competency centres
- Scenarios evaluated and presented to the TUI
board decision - - Further investigate outsourcing all of EM and
local re-engineering, including GEMS - Abandon single MRO and competency centres
3Project Zeus
- Purpose
- Conducted a review of EM Supply Chain to
optimise its performance and to position it for
the future - Provided an input to the two remaining options
under Project Challenge, - i.e. outsourcing all of E M and local
re-engineering - Scope
- Thomsonflys Engineering and Maintenance Supply
Chain (E M SC) - Reviewed structure, skills, processes, systems
and stock levels - Phase I (August 2004 October 2004)
- Identified key tactical business, process and
data improvements - Proposed strategic improvements, ensuring
alignment with - Opportunities offered within the TUI Group
- Project Challenge
- Project LOLA
- C Check Escalation
- A Check Optimisation
4Project Zeus - Phase I (Q3 2004)
- Delivered as agreed in project terms of reference
- Documented Findings
- Tactical Actions Outlined
- Improving inventory Accuracy
- Optimising inventory levels
- Strategic Improvements Outlined
- Organisation Structure Roles
- Skills Experience
- KPIs Accountability
- Process Redesign Implementation
- Deliverable incremental to the project terms of
reference - Cost/Benefit Analysis Model and Template for all
Supply Chain initiativesFeeding into the local
re-engineering option of Project Challenge
5EM Supply Chain The story so far
- Focus of the last 3 years
- Consistently reducing the cost base whilst
maintaining an adequate level of service for an
expanding business model. - Delivering in excess of 8.5m pa business
benefits through - - Reduced Headcount by 40 over a period of 18
months, to end 2003, reducing the cost base by
over 350k pa - Rationalised inventory holding achieving in
excess of 6m benefits - Increased revenue contribution by winning
profitable business, in excess of 1m pa - Delivered bottom line benefits in excess of 1m
pa through improved contract coverage and
improved sourcing strategy - Strategically outsourced non-core services
delivering in excess of 250k pa
6EM Supply Chain The way forward
- A supply chain function that operates
pro-actively, effectively and efficiently in
delivering bottom line business benefits and an
excellent service to BAL, TUI and its customers. - This will include -
- The design and implementation of an
organisational model that - Is composed primarily of knowledge workers
- Ensures clarity of roles and responsibility
- Enables full accountability
- Enables the outsourcing of all low skills-based
areas - Embedding a culture that encourages teamwork,
initiative and a can-do attitude - Processes that are simple, auditable, measurable
and streamlined
7Key findings addressed
- Inventory data is consistently inaccurate
- Inventory levels are in excess of business need
- Insufficient contracts and framework agreements
in place - No consolidated/comprehensive view of procurement
and invoice settlement activity - No active supplier management
- Unable to assess profitability of services sold
to customers - poor data quality and quantity - People skills less than needed, performance
less than acceptable
8Inventory data that was consistently inaccurate
- Scale of the inaccuracy is hidden by the
- Reporting format
- Process halting when the report is delivered?
- Perpetual stock checks are used solely to correct
financial records - NO root cause analysis
- NO corrective actions
- Cause of inaccuracies extend beyond the span of
control of the Supply Chain team - NO clear mechanism to ensure compliance to
record-keeping from the Engineering community
9Inventory levels that were in excess of business
need
- Accountability and ownership unclear
- Inaccuracies are corrected manually rather than
systemically - Processes and actions for materials forecasting
planning and the setting of replenishment levels
are ad-hoc rather than methodical - No clear and agreed process/procedure to address
old removed parts, resulting in an
accumulation of redundant/obsolete inventory - No clear and agreed process/procedure to dispose
of redundant/obsolete stock
10Insufficient contracts and framework agreements
being in place
- Low contract coverage for procured services
- No contract or framework agreement coverage for
airline approved parts - The process for requesting contracts award is
ad-hoc and initiated on an as requested basis
no contracting strategy or formalised, methodical
process - Resources and skills are not in place to
pro-actively manage negotiation, tender activity
and contracts, resulting in business exposure
from unqualified staff entering into
negotiation and supplier selection - Key contract information not readily available
for repair activity
11Absence of consolidated/comprehensive view of
procurement and invoice settlement activity
- Procurement carried out using
- IES (Integrated Engineering System) for Airline
Approved Parts - Oracle iProcurement for commercial parts and
general purchasing - Services non-PO invoices processed via Oracle
- No single view of purchasing commitments related
to Engineer Maintenance activities - Disjointed processes and systems, resulting in
data inaccuracies and significant issues in
reconciliation - IES has been designed primarily from an
engineering perspective and does not lend
itself to enabling pro-active analysis, planning
and management of procurement activity
12No active supplier management
- Supplier performance
- No monitoring or reporting
- No evaluation meetings
- No formalised feedback mechanisms
- No formalised mechanisms for sharing plans and
projections - No strategic sourcing strategies
- No commodity strategies
- No visible market data analysis
13Inability to assess profitability of services
sold to customers - poor data quality and quantity
- Unreliable recording of man-hours
- Misunderstanding/misinterpretation of available
man-hour data - All required data not available
- Disjointed processes and systems between
engineering, contracts and sales - Capacity planning information not readily
available - Resulting in
- Difficulties in charging correct amounts to
customer - Difficulties in assessing potential profitability
- Difficulties in assessing actual profitability
14People skills less than needed, performance
less than acceptable
- Organisation structure and boundaries are not
conducive to team work - Process are broken and disjointed across the
organisation - Skills level is not sufficient for an effective
supply chain management group - Resources mix inappropriate
- On-going headcount reductions and business
uncertainty for Thomsonfly as a whole has
dampened motivation and developed a culture where
job security is sometimes managed by protecting
job content knowledge - Morale and motivation too low for the
productivity and performance required going
forward - Environment not conducive to exhibiting
initiative or gaining recognition for any
significant contribution - Silo mentality - very little periphery vision
15Implemented a Tactical ActionImproving Inventory
Accuracy
- Luton Main Stores (highest occurrence of
inaccuracies) - Root Cause Analysis to be initiated immediately
- Corrective actions, including any process
changes, to be applied to all relevant stock
locations - 3rd-Party Agencies
- Root Cause Analysis to be initiated immediately
- Corrective actions, including any process
changes, to be implemented - Perpetual Stock Check (PSC) Process
- Immediate redesign of reports to accurately
reflect scale of discrepancies - Redesign process
- To capture, where possible, cause and effect
information - To complete only when corrective and preventative
action has been implemented for each cause
16Organisation Structure Roles
Supply Chain Manager
Contracts Management Group Leader
Services Management Group Leader
Commodity Management Group Leader
Contracts Specialists
Revenue Specialists
Services Specialists
KPIs
KPIs
17Commodity Specialists
- Role Responsibility
- Materials Planning
- Commodity strategies
- Stock level
- Stock accuracy
- Procurement
- Supplier Performance Management
- Supply-base analysis
- Contracting requirements
- Contract management
- Teamwork with
- Contracts Specialists
- Outsource Specialists
- Revenue Specialists
- Liaison with engineering community for materials
needs for all maintenance and repair activity - Management of loans
- Repair and warranty management
- Management reporting
- Skills Experience
- Aviation Engineering Maintenance supply-base
knowledge - Procurement and/or Materials planning experience
- Degree/Diploma plus 5 years
- Commercially astute
- Strong inter-personal
- Strong communication (written verbal)
- Highly analytical
- Team player
- KPIs Accountability
- Minimise stock excess stock levels vs. usage
- Minimise stock shortages (AOG Loans data)
- Minimisation of Loans-In
- Revenue from Loans-Out Sales
- Savings Cost optimisation
- Supplier Scorecards (quality of supplier
performance) - Internal Customer Satisfaction
- Performance against contracts
18Commodity SpecialistsClosed-loop Performance
Improvement
- Role Responsibility
- Materials Planning
- Commodity strategies
- Stock level
- Stock accuracy
- Procurement
- Supplier Performance Management
- Supply-base analysis
- Contracting requirements
- Contract management
- Teamwork with
- Contracts Specialists
- Outsource Specialists
- Revenue Specialists
- Liaison with engineering community for materials
needs for all maintenance and repair activity - Management of loans
- Repair and warranty management
- Management reporting
Performance in Role
Capability Required
- KPIs Accountability
- Minimise stock excess stock levels vs. usage
- Minimise stock shortages (AOG Loans data)
- Minimisation of Loans-In
- Revenue from Loans-Out Sales
- Savings Cost optimisation
- Supplier Scorecards (quality of supplier
performance) - Internal Customer Satisfaction
- Performance against contracts
- Skills Experience
- Aviation Engineering Maintenance supply-base
knowledge - Procurement and/or Materials planning experience
- Degree/Diploma plus 5 years
- Commercially astute
- Strong inter-personal
- Strong communication (written verbal)
- Highly analytical
- Team player
Development Plan
19Commodity Management Group Leader
- Role Responsibility
- Leadership and co-ordination of Commodity
Specialist team - Liaison with all areas of BAL and TUI pertinent
to commodity planning and delivery - Management reporting
- Performance management
- Skills Experience
- Aviation Engineering Maintenance supply-base
knowledge - Degree plus 10 years
- Procurement and/or materials planning
- Sound leadership
- Strong inter-personal
- Strong communication (written verbal)
- Commercially astute
- Highly analytical
- Team player
- KPIs Accountability
- Employee Satisfaction
- 360 degree feedback
- Aggregated team KPIs
20Commodity Management Group LeaderClosed-loop
Performance Improvement
- Role Responsibility
- Leadership and co-ordination of Commodity
Specialist team - Liaison with all areas of BAL and TUI pertinent
to commodity planning and delivery - Management reporting
- Performance management
Performance in Role
Capability Required
- Skills Experience
- Aviation Engineering Maintenance supply-base
knowledge - Degree plus 10 years
- Procurement and/or materials planning
- Sound leadership
- Strong inter-personal
- Strong communication (written verbal)
- Commercially astute
- Highly analytical
- Team player
- KPIs Accountability
- Employee Satisfaction
- 360 degree feedback
- Aggregated team KPIs
Development Plan
Leadership Performance
21Outsourced Services
- Stores
- Goods receiving
- Returns Management
- Warehousing and Stores Movement
- Inventory Pooling
- Logistics
- UK Overseas Planning Handling
- Sales Agents
- Surplus Stock
- Repair Agents
- Engines APUs
- Components
- Maintenance (C-Checks, A-Checks, Line,
Unscheduled) - Overflow
- Strategic/Planned
22Strategic Process Redesign ImplementationInvent
ory Level Management
Key Inventory Definitions Redundant No longer
valid for Fleet Obsolete No longer valid for any
airline Excess Too much valid stock
- Included -
- A comprehensive disposal timetable
- For Redundant/Obsolete Stock
- Quarterly review and disposal process capturing
input for the KPIs of relevant Commodity
Specialists - Event-based review and disposal process for stock
replaced through normal course of business and/or
exceptional events (e.g REFRESH programmes) - For Excess Stock
- Quarterly review and disposal process for
potentially excess stock capturing input for
the KPIs of relevant Commodity Specialists - Maintenance plan-based review and tuning of
replenishment levels (by Commodity Specialists
for each of their commodities) - Key inputs for both processes (i.e. Quarterly
reviews and plan-based reviews) - Stock Usage vs. Stock Turns
- Forecasted Usage
- Current and projected market value and purchase
price - Business impact reporting of stock shortages
(AOG/Loan Costs) - capturing input for the KPIs of relevant
Commodity Specialists
23Strategic Process Redesign ImplementationStrate
gic Sourcing Contract Management
- Included -
- The development and ongoing management of
- Sourcing Strategies
- Contract Strategies
- Full life-cycle management and administration of
- Tenders
- Contracts
- Framework Agreements
- Monitoring and reporting of
- The coverage of commodities and services with
contracts and framework agreements - Procurement activity against contracts and
framework agreements - Performance and continued fit of contracts and
framework agreements - Off-contract activity
24Supplier Management
- Included -
- Supplier Scorecards that enable analysis and
decision-making related to supplier performance
in key areas, e.g. - - Price
- Quality
- Delivery/Lead-time
- Responsiveness
- Data collection processes that enable the
construction of the Supplier Scorecards based on
consistent and, wherever possible, objective data - Supplier performance review process, including -
- Internal review
- Supplier feedback
- Supplier ranking
- Supply base optimisation
25Market Development and Customer Satisfaction
- Included -
- Business and market development strategies and
plans - Sales performance management
- Key decision-making data to win profitable
business - Customer satisfaction surveys and associated
processes and timetable - Market/Customer review process, including -
- Internal review
- Feedback from Customers
- Customer ranking
- Customer base optimisation for maximum
profitability
26People Management
- Included -
- Date collection, monitoring and reporting
processes for all KPIs - Employee satisfaction surveys and associated
processes and timetable - 360 degree feedback process
- On-going skills review and gap analysis
- Group and individual development plans and
timetables - Skip-level meetings (i.e. relatively informal
meeting between a manager and staff two levels
away in the organisations structure, skipping a
level) - High-visibility employee recognition programmes
27Transition Route Map with Optional Outsourcing
of Stores
8-10 weeks
6-8 weeks
8-10 weeks
- Finalise embed organisation
- Review performance of all staff in new roles
- Recruitment shortlist identified if any role
needs to b revisited - Assessment centres completed and new staff
assigned - Skills gap analysis and associated development
plans in place for any new appointments - Probationary performance targets in place for new
appointment - Routine performance target established for
remaining staff - Redundancy processes completed, if appropriate
- Set-up mobilisation
- HR support and participation initiated
- Group Leader assignments
- Target roles for existing Group Leaders
identified - Recruitment shortlist identified
- Group leader Assessment centres completed and
group leaders assigned - Skills gap analysis and associated development
plans in place - Probationary performance targets in place
- Specialists assignments
- Target specialists roles for existing staff
identified - Recruitment shortlist identified
- Specialists Assessment centres completed and
staff assigned - Skills gap analysis and associated development
plans in place - Probationary performance targets in place
- Redundancy processes completed
- New organisation
- Staff feedback cycles completed
6 month probationary period for each role
- Role profiles and associated target skills
matrix in place - Recruitment campaign initiated
- Assessment centres designed and scheduled
Design of new business process and procedures
completed
Ongoing Performance monitoring and review
Probationary Performance monitoring and review
Rationalisation of STORES
Optional Outsourcing of STORES
28Project Challenges
- Support increased number of outsourced
maintenance Checks - Management of complex component support
arrangements across mixed fleet i.e. Thomsonfly,
Nordic, Third Party, etc - Maintaining business continuity whilst
transitioning the Supply Chain through its
organisational restructure - Facing the challenge of up-skilling and changes
to the Fabric of the business - For employees this means either
- Repair (develop, train, grow)
- Remove (re-deploy elsewhere or leave)
- Replace (external recruitment)
- For peers this means exposure
- Embedding a culture that encourages teamwork,
initiative and a can-do attitude with processes
that are simple, auditable, measurable and
streamlined