Gulf Marinas FZC - PowerPoint PPT Presentation

1 / 40
About This Presentation
Title:

Gulf Marinas FZC

Description:

Gulf Marinas FZC – PowerPoint PPT presentation

Number of Views:258
Avg rating:3.0/5.0
Slides: 41
Provided by: asim90
Category:
Tags: fzc | gulf | marinas | pica

less

Transcript and Presenter's Notes

Title: Gulf Marinas FZC


1
Gulf Marinas FZC
  • Come Walk on Water

2
Gulf Marinas FZC
3
  • The factory is located on 45000m2 Hamriyah Free
    Zone, Sharjah UAE, has a capacity to produce 1000
    linear meters of floating marinas per week and
    able to ensure complete customer satisfaction
    through its team who are able to design ,
    manufacture , install and maintain any project as
    and when required.

4
Manufacturing
  • Aluminium pontoons
  • Fingers
  • Bridges
  • Ranging from light type pontoons to heavy duty
    pontoons
  • Wide selection of marina
  • Pontoon accessories

5
Scope of work
  • Our experienced designers , with their thorough
    background in marina construction and boat
    building provide, clients the most suitable
    designs, accurate calculations and
    recommendations for any type of marina .

6
Scope of work
Manufacture
  • Our dynamic in-house engineers, technicians,
    technicians and highly skilled labour give the
    quality of marina you can count on.

Supply
  • An in-house facilities and outside contacts make
    material supply a very minor issue for local and
    export market.

7
Scope of work
Installation
  • Ready to do installation for any project when and
    where required. If installation made by others,
    then we supervise the client during installation.

After supply service
  • You can expect our crew on your marina for
    periodic checking

8
Special Workforce
9
Technical Description
10
Technical Specification
  • Our Floating Marina/jetty are designed,
    manufactured and installed using a Quality
    management System ISO 9001 and are built from
    marina grade aluminum alloy with timber decking.
    (Standard with options available)

11
Technical Specification
Fenders
  • Identified as a light molecular weight
    polyethylene board called Ecoplanking of maximum
    40mm thickness as installed on designated pontoons

12
Technical Specification
Fenders
  • D Rubber Fender specified as a medium density
    rubber extrusion with air pockets to take the
    continuous impact of vessels coming alongside

13
Pontoon System
14
Anchoring System
15
Bridges
Structure of welded aluminium alloy 6082 T6
. Rounded corner square aluminium tubing
handrail . Designed to be mounted in different
ways to suit piles or anchors . Supplied with
nylon rollers , hinges and transition plates
. Decking of kiln dried grooved hardwood
,plastic wood , carpets or any other specified
material .
16
Projects
17
Projects
  • Installed to dock the RTA Water Busses built by
    our sister concern Seaspray Marine Services
    Engineering FZE. The RTA Water Bust Terminal at
    Al Seef Dubai Creek is a practical application
    allowing for a safe means of passenger
    disembarking and embarking while efficiently
    monitoring the operations from the Floating
    office to which our Marinas have been attached.

18
Projects
  • RTA Project

19
Projects
20
Projects
  • Sheikh Hamdan Project

21
Accessories
22
Bolghati Marina
Option 1
23
Bolghati Marina
Option 2
24
Bolghati Marina
Option 3
25
Dubai Marina
PIER A
26
Dubai Marina
PIER B - C
27
Dubai Marina
PIER D
28
Dubai Marina
PIER E
29
Sri Lanka
A
30
Sri Lanka
A
31
Marina Goa
32
Chennai Marina
33
Chennai Marina
34
Nakheel
35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com