By Randolph R. Sleight PE, PLS, F. ASCE - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

By Randolph R. Sleight PE, PLS, F. ASCE

Description:

Reduce interior landscaping standard with use of pervious pavement. ... Reduces impervious surfaces and encourages use of pervious pavement. ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 8
Provided by: spw2
Category:

less

Transcript and Presenter's Notes

Title: By Randolph R. Sleight PE, PLS, F. ASCE


1
By Randolph R. Sleight PE, PLS, F. ASCE
Integrating LID Techniques February 1, 2006

of Snohomish County
2
NPDES
NPDES
  • Draft Phase I National Pollutant Discharge
    Elimination Permit and what this means to Phase 1
    2 Permittees.

3
2005 DOE Manual
4
2005 PSAT LID Manual
  • May require new ordinance or processes like
  • Reduced Drainage Demonstration Project
  • A stand alone LID ordinance like a draft prepared
    by AHBL Consultants
  • A modified version of the above to fit the unique
    soils and topography of a City or UGA
  • A recognition of LID in the Comprehensive Plan
    and Fully Contained Communities (FCC)
  • A streamlined process for schools that are now
    required to use LID and Sustainable Development
    in their Master Planning

5
LID Definition
  • The technical guidance manual defines LID as a
    stormwater and land development strategy applied
    at the parcel or subdivision scale that
    emphasizes conservation and use of the on-site
    natural features integrated with engineered,
    small scale hydrologic controls to more closely
    mimic pre-development hydrologic functions.

6
Inventory and Assessment
  • Soils analysis
  • Hydrologic patterns and features
  • Native forest or land cover
  • Wetlands, streams or critical areas
  • Floodplains
  • Topography
  • Slope stability and infiltration proximity to
    steep slopes

7
Incentives
Write a Comment
User Comments (0)
About PowerShow.com