GAUTRANS APT - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

GAUTRANS APT

Description:

SPECIFICATIONS FOR HVS MARK III AND MARK IV. Fixed ... Only Moving Constant Loads ... Dynamic Cone Penetrometer (DCP) Deflection, permanent deformation ... – PowerPoint PPT presentation

Number of Views:129
Avg rating:3.0/5.0
Slides: 16
Provided by: naki
Category:

less

Transcript and Presenter's Notes

Title: GAUTRANS APT


1
GAUTRANS APT
  • ELZBIETA SADZIK
  • MAY 2002

2
SPECIFICATIONS FOR HVS MARK III AND MARK IV
3
COST BENEFIT HVS III vs HVS IV
  • 57 Decrease in total production cost
  • 50 Increase in production
  • 19 Decrease in Fuel consumption
  • 56 Decrease in down time

4
Comparative Cost HVS III vs HVS IV
  • HVS Mk III 80 cents/load repetition
  • HVS Mk IV 50 cents/load repetition

5
HVS testing sites
6
Testing subjects
7
HVS accompanied tests
  • Laboratory
  • Standard laboratory
  • Grading, Atterberg, OMC/MDD (untreated)
  • CBR, UCS, ITS
  • Advanced laboratory
  • Flexural beam test (FBT)
  • Static and dynamic triaxial (STT and DTT)
  • Durability
  • Permeability
  • Wheel-tracking erosion (WTE) and mechanical brush
    (MBT)

8
HVS accompanied tests
  • Field
  • HVS
  • Material characterisation
  • Field moisture and density, environmental data
  • Dynamic Cone Penetrometer (DCP)
  • Deflection, permanent deformation and rut
  • LTPP
  • Visual evaluation
  • Deflections
  • Traffic survey

9
Test matrix for foam-treated material
10
Test matrix foremulsion-treated material
11
HVS management
Steering Committee
Scope
Needs
Prioritisation
Technical management
Proposals
Guidelines
Reports
Technical panel
Review Pool
12
Issues discussed
  • Unanimous agreement on historical benefit of HVS
    research for pavement engineering in South Africa
    and a need to continue
  • Needs identified
  • Long-term research objective
  • Ad hoc needs (proof testing)

13
Steering Committee identified needs
  • Cold-mix recycling
  • Rut-resistant solutions
  • Ultra-thin thin concrete layers
  • Appropriate asphalt overlays seals
  • New cement / high UCS layers

14
Steering Committee identified needs
  • Composite pavements
  • Cost-effective solutions for low-volume roads
  • Risk assessment management
  • Vehicle-pavement interaction

15
Proposal
  • It is proposed that an APT Steering Committee be
    established as a sub-committee of the RPF
Write a Comment
User Comments (0)
About PowerShow.com