The AGATA Project - PowerPoint PPT Presentation

About This Presentation
Title:

The AGATA Project

Description:

Based on the novel technique of gamma-ray tracking. ... UK: Daresbury, Brighton, Keele, Liverpool, Manchester, Paisley, Surrey, York ... – PowerPoint PPT presentation

Number of Views:101
Avg rating:3.0/5.0
Slides: 16
Provided by: Gerl
Learn more at: https://www.nupecc.org
Category:
Tags: agata | paisley | project

less

Transcript and Presenter's Notes

Title: The AGATA Project


1
The AGATA Project
International experimental facility for the
investigation of nuclear structure, nuclear
astrophysics and fundamental interactions
  • First 4pi ?-ray spectrometer built completely
    from Germanium detectors.
  • Based on the novel technique of gamma-ray
    tracking.
  • Measures ? radiation in a very large energy
    range, with the largest possible
  • efficiency and with a very good spectral
    response.
  • Several orders of magnitude more powerful than
    any current and near-future
  • ?ray spectrometer in the world.
  • Key parameters are (i) an energy range lt 50 keV
    to gt 10 MeV, (ii) a photo-peak
  • efficiency of about 50 at 1 MeV, (iii) a
    position resolution of lt 5 mm and
  • (vi) a trigger rate of up to 1 MHz.

NUPECC Meeting 16.3.07 J. Gerl GSI
2
AGATA Collaboration
Clustering of the nuclear structure community
around a well organized and focused European
research collaboration
Bulgaria Sofia Denmark Copenhagen Finland
Jyväskylä France GANIL, Lyon, Orsay, Saclay,
Strasbourg Germany Berlin, Bonn, GSI,
Darmstadt, Köln, München Hungary
Debrecen Italy Padova, Milano, LNL, Firenze,
Camerino, Napoli, Genova Poland Krakow, Swierk,
Warsaw Romania Bucharest Sweden Lund,
Stockholm, Uppsala Turkey Ankara, Istanbul UK
Daresbury, Brighton, Keele, Liverpool,
Manchester, Paisley, Surrey, York
NUPECC Meeting 16.3.07 J. Gerl GSI
3
AGATA Facility
AGATA is intended to be an independent, movable
Research Infrastructure to be coupled to stable
and exotic ion beam accelerators in European host
laboratories
Accepted Host Laboratories for the Demonstrator
Phase 2008-2011 LNL Legnaro GANIL Caen
GSI Darmstadt ILL Grenoble Interested
Host Laboratories for the AGATA array FAIR /
GSI Darmstadt SPIRAL 2 / GANIL Caen
SPES / LNL Legnaro REX-ISOLDE / CERN Geneve
JYFL Jyväskylä ILL Grenoble ....
NUPECC Meeting 16.3.07 J. Gerl GSI
4
AGATA RD Phase
Prototyping, testing, commissioning...
  • Develop 36 fold segmented encapsulated detector
    of right shape
  • Develop cryostat for groups (clusters) of these
    detectors
  • Develop digital electronics (700 channels)
  • Finalise signal algorithms for energy, position
    and time
  • Develop tracking algorithms
  • Build demonstration unit to prove tracking in
    real situations
  • Write technical proposal for full array

5
AGATA Demonstrator
Main objective of the RD phase
1 symmetric triple-cluster 5 asymmetric
triple-clusters 36-fold segmented crystals 540
segments 555 digital-channels Eff. 3 8 _at_
Mg 1 Eff. 2 4 _at_ Mg 30 Full DACQwith on
line PSA and ?-ray tracking Test Sites GANIL,
GSI, Köln, LNL
6
AGATA Demonstrator Funding
Latest estimated cost (3 sym 15 asym.) k
ex tax Detectors 4033 Electronics 1378 DAQ
287 DI 103 Ancillaries 24 Data analysis
20 Total 5844
Capital for the demonstrator
France, Germany, Italy, Sweden, Turkey and UK
Total 6006 k ex tax
15 3 detector system possible (just)
 
7
AGATA Detectors
Detectors in time...
  • Symmetric detectors
  • 3 delivered
  • Asymmetric detectors
  • 15 ordered, 4 delivered
  • Triple cryostats
  • 3 (soon 4) ordered
  • 1st expected May
  • Test cryostats
  • 3 delivered
  • 1 ordered (expected soon)
  • Preamplifiers
  • Core (cologne) Segment (Ganil. Milano) working

8
AGATA Electronics
Digitizer ?
Preamplifier ?
Pre-processing, further development needed
9
Köln in-beam test 2005
REACTION CHANNEL (d,p)
PSASegDet
1382 keV
10
AGATA Design and Construction
Infrastructure in time...
  • 180 geometry defined
  • Conceptual design of 180 array done
  • Details of HV, LN2 control etc. agreed, GSI test
    done
  • Design of AGATA demonstrator for LNL in final
    stage
  • Flanges manufacturing started
  • Assembly in LNL in autumn 2007

11
Status of the AGATA Project
What remains to be done
  • Next steps
  • Build up triple detector (s)
  • Ge detector characterisation
  • Pulse-shape analysis algorithms optimised
  • Gamma-ray tracking algorithms optimised
  • Electronics and DAQ prototypes and production
  • Demonstrator ready by 2008
  • First physics campaign at Legnaro in late 2008
  • Further campaigns at GANIL, GSI, (ILL)

12
AGATA Project Evolution
How to proceed
  • Demonstrator ready in 2008
  • Next phases discussed in 2005-2007
  • New LoI for construction phase 2005
  • First funding bids for production in D and I
    successful
  • New MoU in preparation (required by D in 2007 to
    release funds)
  • New organisational structure
  • Start construction in 2008, 1? in possible in
    2011
  • Rate of construction depends on production
    capability
  • Physics exploitation in stages, AGATA facility
    development

13
AGATA Timetable
Well structured organization based on LoIs and
MoUs
2001 2003 2005 2007 2009 2011 2013 2015 2017
Proof of Principle
RD Demonstrator
Construction Phases
Comm .
Demonst. Physics
Phase 1 Physics
Phase 2 Physics
Full operation Physics
NUPECC Meeting 16.3.07 J. Gerl GSI
14
AGATA Cost and Effort
Well structured organization based on LoIs and
MoUs
2001 2003 2005 2007 2009 2011 2013 2015 2017
Preparatory phase Invest 6.5
M Effort 120 FTE
Construction phase Invest 50
M Effort 100 FTE
Operation Cost lt 1 M
TMR
I3 EURONS
EC FP7
NUPECC Meeting 16.3.07 J. Gerl GSI
15
AGATA Funding
AGATA is a moving Research Infrastructure
developed, built and operated by a truly European
research collaboration
  • Too large for funding within national nuclear
    structure schemes
  • Too small for CNI funding in FP7 based on ESFRI
    criteria
  • Moving instrument, therefore no governance by any
    accelerator facility

A dedicated funding scheme supporting medium
scale European projects is needed
  • NUPNET as "natural" funding agency contact
  • ERANET as appropriate funding instrument in FP7
  • Possibly governance by NuPECC
  • Operation as independent Research Infrastructure
    eligible for TNA support in FP7
Write a Comment
User Comments (0)
About PowerShow.com