GSE coloc2 consortium template - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

GSE coloc2 consortium template

Description:

Definition studies for Sentinel 1 (SAR continuity) ... Co-ordinate & elaborate requirements for architecture & infrastructure. Main Deliverables : ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 7
Provided by: briant61
Category:

less

Transcript and Presenter's Notes

Title: GSE coloc2 consortium template


1
GMES Preparatory Activities
A suite of studies initiated by ESA in 2005 to
prepare for the implementation of the EO
component of GMES See procurement proposal
ESA/IPC/(2004)70
2
GMES Preparatory Activities
  • 7 Lines of preparatory activities covering
  • Socio-Economic Benefits of GMES
  • Four Architecture studies
  • Long-term scenario for implementation
  • Services evolution
  • Evolution of ground-segment
  • Space missions status evolution
  • Ground-Segment activities
  • Definition studies for Sentinel 1 (SAR
    continuity)
  • Definition studies for Sentinel 2 (Land
    super-spectral)
  • Definition studies for Sentinel 3 (Ocean family)
  • Phase-0 studies on Sentinels 4 5 (Atmospheric
    composition)

3
Relationships between Preparatory Activities
4
GMES Services Evolution
  • Scope defined in IPC paper 1.5 Meuro, 12 months
  • Main Activities
  • Analyse services currently under development
    (GSE, EC FP6, national),
  • Co-ordinate elaborate requirements for
    architecture infrastructure.
  • Main Deliverables
  • Requirements for all aspects implementation of
    GMES in the next phase (including service, G/S
    Space components),
  • Scenarios for service delivery with focus on EO
    components,
  • Conditions for evolution of services to
    operational status,
  • basic requirements (in longer term) for the
    overall architectural structure of the GMES
    implementation.

5
Approach to GMES Services Evolution
Build on Work to Date
User Orgs Industry
GMES Services Baseline Implementation Organisation
Structure Design
Bring New Perspectives
Consolidate Future Vision
Global Change
Geo Political
Citizen
Security
Industry
2015 Services Portfolio
Services Implementation Architecture
Requirements
Dossiers issues implications for GMES services
Implementation Action Plan
Implementation Road Map
6
ITT, Bid, Contract Schedule
  • ITT Release April
  • Prepare Bids May - June
  • Contract Negotiation KO July
Write a Comment
User Comments (0)
About PowerShow.com