reconstruction, jug. handles. 1. Money Counts. Original Study Recommendation. 1. Money Counts ... Bid out in June 2005, 3 years sooner than initially envisioned. ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 21
Provided by: janel2
Category:

less

Transcript and Presenter's Notes

Title: Route 22, Dauphin County, District 8


1
1. Money Counts
  • Safety project on 4-
  • miles of Route 22
  • Sight distance issues
  • causing crashes at
  • median openings
  • Initial solution required
  • extensive
  • environmental studies,
  • ROW acquisition,
  • reconstruction, jug
  • handles

Route 22, Dauphin County, District 8
2
1. Money Counts
Original Study Recommendation
3
1. Money Counts
Right Size Design
4
1. Money Counts
  • Bid out in June 2005, 3 years sooner than
    initially envisioned.
  • Reduced lane widths from 12 to 11, shoulder
    width from 7 to 6
  • Eliminated additional environmental studies and
    ROW takes
  • needed for a wider section.
  • Original Estimate 5.8 Million
  • Final Cost 1.9 Million
  • Savings 3.9 Million
  • District closely coordinated with West Hanover
    Township and
  • responded to community desire for new traffic
    signals
  • Township provided design of new signals -
    sharing resources

5
2. Leverage Preserve Existing Investments
Accelerated Bridge Program
6
3. Choose Projects with High Value/Price Ratio
  • Intersection at LOS F with 220-sec. signal cycle
  • Initial solution proposed is grade-separation
  • Interchange would have significant ROW impacts,
    require extensive studies, and is very costly

US 11/15 21st Street Intersection Improvements,
Cumberland County, District 8
7
3. Choose Projects with High Value/Price Ratio
  • At-grade solution addressing traffic issues was
    developed
  • Intersection improvements, including
  • 2nd Left Turn Lane on US 11-15 Northbound
  • Additional lane on 21st Street
  • Left turns from SR 1014 Westbound
  • Moving existing left-hand merge of US 11-15 with
    SR 1014 to occur at a signal

Before
After
US 11/15 21st Street Intersection Improvements,
Cumberland County, District 8
8
3. Choose Projects with High Value/Price Ratio
  • 160-sec. signal cycle length
  • Improvements on operations and safety
  • Changes all within the existing ROW
  • Cost Savings
  • - Interchange 12.5M
  • - At Grade 2.6M
  • - Savings 9.9M

Before
After
US 11/15 21st Street Intersection Improvements,
Cumberland County, District 8
9
4. Safety First and Maybe Safety Only
  • 4-lane commercial corridor scheduled for
    re-paving
  • Lower Paxton Township requested DOT to look at an
    intersection experiencing high rates of crashes

Route 22 Paving Project, Dauphin County, District
8
10
4. Safety First and Maybe Safety Only
  • Reduced widths of travel lanes (from 12 to 11)
    and shoulder helped calm traffic
  • Eliminated left outs at the intersection
  • Allowed for 10 painted median and left turn lane
    addressing safety problem
  • Commercial traffic could use local network to
    access US 22

Route 22 Paving Project, Dauphin County, District
8
11
5. Look Beyond Level of Service
5 Minutes
7 Minutes
12th Street Corridor/ Bayfront Parkway, Erie,
District 1
12
6. Accommodate All Modes of Travel
  • Bridge over Amtrak was structurally deficient
  • Route 72 is a major gateway into historic city
    of Lancaster and a multi-modal corridor
  • High bicycle and pedestrian area
  • Community desired a gateway design into
    Historic Downtown Lancaster

SR 72 Fruitville Pike Bridge, Lancaster County,
District 8
13
6. Accommodate All Modes of Travel
  • Bicycle facilities designed in collaboration with
    Lancaster bicycle clubs, Amtrak, Red Rose
    Transit, and County
  • Bicycle facility lane markings and "share the
    road" signs were installed.

SR 72 Fruitville Pike Bridge, Lancaster County,
District 8
14
7. Enhance local network
Need 7 to 9 Lanes
73,500
25,000
9,000
6th
12,000
8th
27,500
12th
15 Lanes
12th Street Corridor/ Bayfront Parkway, District 1
15
8. Build Towns Not Sprawl
  • The loss of AMP/TYCO campus (over 2,500 jobs) had
    a big impact on adjacent commercial areas and the
    City of Harrisburg
  • Challenge was how to revitalize area and
    capitalize on redevelopment opportunities of
    former campus
  • Paxton St. was a one-way state highway that made
    access and traffic circulation difficult

Paxton Street, District 8, Dauphin County
16
8. Build Towns Not Sprawl
  • Public-private partnership between developers,
    Swatara Township, and PennDOT
  • Local funds used for all pre-construction
    activities
  • Re-established two-way traffic on Paxton St. and
    created new and improved access to TecPort Center
    and Harrisburg East Mall
  • TecPort Center now provides over 3,500 jobs.
    Additional 1,500 jobs planned in the future.

Paxton Street, District 8, Dauphin County
17
9. Understand the Context Plan Design Within
the Context
Rural Area
Coming into Town
Town Center
18
10. Develop Local Governments as Strong Land Use
Partners
  • Historic Annville Main Street adjacent to
    Lebanon Valley College
  • Roadway resurfacing and improvement of SR 934 and
    SR 422
  • Area also needed pedestrian facility and parking
    improvements
  • Community Desire for Downtown revitalization

SR 422 Annville Streetscape, Lebanon County,
District 8-0
19
10. Develop Local Governments as Strong Land Use
Partners
  • Coordinated with Borough to develop solution
    appropriate to historic context and supported
    downtown revitalization
  • Left turn lanes were appropriately sized to
    improve safety and address congestion but
    minimize loss of parking
  • Borough helped with bank reconstruction
  • Project funding from state, local and private
    funds including Transportation Enhancements
    Program, STP funds, Maintenance funds, and
    53,000 from private donations

SR 422 Annville Streetscape, Lebanon County,
District 8-0
20
10. Develop Local Governments as Strong Land Use
Partners
SR 422 Annville Streetscape, Lebanon County,
District 8-0