NOUR MW Projects - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

NOUR MW Projects

Description:

Nour completed the mentioned variety of projects for several clients ... Antenna Mount and Feeder Gantry. Upgrading of Existing Sites to house the new equipment ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 21
Provided by: khaledwal
Category:
Tags: nour | gantry | projects

less

Transcript and Presenter's Notes

Title: NOUR MW Projects


1
  • NOUR MW Projects
  • Presented to
  • Saudi Telecom Company STC
  • Mobile Network Department

2
  • Presentation Contents
  • Clients and Suppliers
  • Introduction to MW Turnkey Implementation
    Capabilities
  • Completed MW Projects
  • Projects Summary
  • Question Session

3
  • Clients Suppliers
  • Nour completed several MW Projects through large
    Manufacturers and Solution Providers, such as,
    Lucent Technologies International, Ericsson,
    Nokia and Motorola
  • Nour utilized the MW Equipments from HARRIS,
    NERA, ERICSSON, NOKIA, ALCATEL, P-COM and DMC
  • Nour completed the mentioned variety of projects
    for several clients such as, Saudi Telecom Co.,
    General Intelligence Department, Public Security
    Directorate, Qatars Ministry of Interior, Saudi
    Border Guard Forces, Saudi Consolidated Electric
    Company, Ministry of Defense Civil Aviation and
    much more.

4
Complete Administrative, Engineering Skilled
Stuff
System Integration, Operation, Maintenance
Optimization
Site LOS Survey
MW TURNKEY CAPABILITIES
MW Design
As-Built Document Production
MW Installation Testing
Civil Major Minor Design, Construction
5
Site LOS Survey
  • Green Filed Site Survey for availability of Main
    Power suitability of Site-Lot for civil
    construction
  • Existing Site Survey for availability of Floor
    Space, Communication Channels, DC Power, Sizing
    the HVAC, Tower Survey with existing loads, etc.
  • Line-of-Sight Survey to verify the connection
    possibility between the two sites under study
    utilizing DGPS Survey Set
  • Documentation to gather all the collected
    information and to introduce a Basic Analysis of
    sites suitability

6
  • MW Design
  • Verify the possible connectivity by means of
    Collected Data along the path using Differential
    GPS, and to compare it with the Digital Maps
    Data-Points as well
  • Finding the most suitable Antenna Heights and
    Mast Height
  • Design Optimization by suggestion of Space
    Diversity, Frequency Diversity, Passive
    Repeaters, Passive Reflectors, etc.

7
  • MW Installation Testing
  • MW System Installation, Power-up and
    Commissioning
  • MW System Testing (Connectivity and Stability
    Tests) over standard periods to ensure the
    Application of Design Criteria and to suggest
    necessary Corrective Action or Optimization
  • MW Network Management System Installation,
    especially the FarScan of Harris MW Radios

8
Minor Civil Design
  • Major Civil Design
  • Site Layout Design
  • Tower Analysis and Suggestion of Reinforcement
    (if necessary)
  • Electrical Network Design for Grounding, Power
    Connectivity, Lightning Protection, etc.
  • Antenna Mount and Feeder Gantry
  • Upgrading of Existing Sites to house the new
    equipment
  • Ability to Design a Roof-Top Site

9
  • Civil Constructions
  • A Complete Site Construction, including
    Foundation Casting, Tower Erection, Equipment
    Generator Shelters Erection, Site Fencing and
    Electrical Network Preparation
  • Shelter Preparation and Testing at Nour Warehouses

10
  • As-Built Documentation
  • It is being prepared throughout the Construction
    and Installation Process to Document any changes
  • As-Built Document is considered the most
    important document in the Hand-Over Stage, Hence,
    it is Checked carefully and its Softcopy is saved
    on CD-Archives

11
  • Operation Maintenance
  • Specialized Engineers and Technicians to Operate
    and Configure the Various Network Elements.
  • All the Necessary Test Equipment for Fault
    Finding and Rapid Maintenance
  • Team Capability of Integrating the various
    elements to the Networks Management System
  • Equipment and Skills to Monitor the Site
    Performance for Preventive Maintenance
  • Nour Offices are distributed in different cities
    of the Kingdom, to ensure quick response to
    customer needs

12
  • Completed MW Projects

1- MW Backbone Network for Saudi PSD (West) 2- MW
Backbone Network for Saudi GID (West) 3- MW
Network for Riyadh PSD (Central) 4- MW Network
Upgrading for Lucent Technologies 5- Junction MW
Network for Saudi Telecom Co. 6- MW Connectivity
Links for GSM Base Stations of Lucent, Ericsson
Nokia Sites
13
  • MW Network for PSD (West)
  • Client Public Security Directorate
  • Location Makkah, Jeddah and Taif
  • Period 1998
  • MW Equipment Alcatel PDH Radio
  • Frequency Band 2 and 4 GHz
  • No. of Hops 12 Hops
  • Job Description
  • MW System Design
  • MW Installation, Testing Commissioning
  • Complete MoP and As-Built Documentation

14
  • MW Network for GID (West)
  • Client General Intelligence Department
  • Location Makkah, Jeddah and Taif
  • Period 1999
  • MW Equp. Harris Quadralink 4 T1 PDH Radio
  • Frequency Band 2 GHz
  • No. of Hops 7 Hops
  • Job Description
  • MW Installation, Testing Commissioning
  • Complete MoP and As-Built Documentation
  • Installation and Setup of Harris FarScan NMS

15
  • MW Network for PSD (Center)
  • Client Public Security Directorate (Central)
  • Location Riyadh
  • Period 2000
  • MW Equipment Harris Microstar PDH 4E1
  • Frequency Band 7 GHz
  • No. of Hops 6 Hops
  • Job Description
  • MW Installation, Testing Commissioning
  • Complete MoP and As-Built Documentation
  • Installation and Setup for Harris FarScan NMS

16
  • MW System Upgrading
  • Client Lucent Technologies International
  • Location Kingdom Wide
  • Period 1999
  • MW Equp. Harris Microstar PDH Radio 16E1
  • Frequency Band 7, 15, 23 and 38 GHz
  • No. of Hops More than 120 Hops
  • Job Description
  • Software Upgrading for 11 Protected System
  • Complete Documentation and Inventory

17
  • Junction MW Network for STC
  • Client Saudi Telecom Co. ( Through LTII )
  • Location Kingdom Wide
  • Period 1997 up to 1999
  • MW Equipment NERA SDH STM-1 Radio
  • Frequency Band 6 and 11 GHz
  • No. of Hops 64 Hops
  • Job Description
  • MW System Design and Optimization
  • MW Installation, Testing Commissioning
  • Complete Frequency Plan, Interference Analysis,
    Propagation Survey, MoP and As-Built
    Documentation
  • Setting-up the Space Diversity Delay Cable,
    Adjusting Group Delay (ATDE) and Optimizing
    Diversity Spacing
  • Passive Repeater Alignment

18
  • GSM MW Connectivity (1 of 2)
  • Client Saudi Telecom Co. (Direct Contracting)
  • Location Kingdom Wide
  • Period 2000 up to Present
  • MW Equipment Microstar (Harris), Flexihopper
    (Nokia), Tel-link (P-COM) and Mini-link
    (Ericsson) PDH Radios 4, 8 and 16 E1
  • Frequency Band 7, 15, 23 and 38 GHz
  • No. of Hops More than 500 Hops

19
  • GSM MW Connectivity (2 of 2)
  • Job Description
  • Line-of-Sight Survey (Preliminary Design Step)
  • MW Documentation and Preparation of PAT Documents
  • Procurement of Materials (Radio, Cabling, Data
    Rack, etc.)
  • MW Systems Swap (low capacity to higher one)
  • Complete MW System Installation, Alignment,
    Panning and Configuration
  • Alignment of Passive Repeaters
  • Performing Fade Margin and Stability Test.
  • MW Hop Testing (PAT to customers satisfaction)
  • System Handover to OM Department

20
Questions Answers Session
Write a Comment
User Comments (0)
About PowerShow.com